Top
Online Service
Hello, welcome to AT Oil and Gas Development Mall ! To provide you with better service, please login in
Sign in
Join for free

Welcome to AT Oil and Gas Development Mall !

DISTRIBUTED CONTROL SYSTEM (DCS) UPGRADE FOR SONDU MIRIU POWER STATION

2023-08-16

Views:382

CHANGE IN EVALUATION CRITERIA
STAGE 2: TECHNICAL EVALUATION ON CAPACITY TO DELIVER THE CONTRACT
Technical evaluation shall be carried out only if the tender is determined to be responsive to
the preliminary examination.
Bidder must demonstrate conformance to the all the technical specifications and
requirements as per section V of the tender document, and as tabulated below.
CRITERIA
No.
DESCRIPTION
TR 1
Bidder must fill the technical schedule as provided in Section V clause 13.
TR 2
OEM Lifecycle Support Letters – A letter from OEM indicating that remaining life cycle
SCADA HMI software and Server hardware is more than ten (10) years to protect the
employer from technical obsolescence.
TR 3
Successful completion of at-least two (2) SCADA HMI system projects using the same
SCADA HMI application for large power generation plants in the last ten (10) years
bidder must attach completion certificate and provide completed projects’ contacts. Attach
also certified work programs of the completed works.
TR 4
Attach detailed work schedule showing minimum effect on availability of plant
TR 5
Compliance to technical requirements as detailed in the tender document.
Attach Brochures/technical data sheets for:
i.
Server Based HMI application
ii.
Server hardwarePage | 2
iii.
PCs -Operator workstations, Engineering workstation, Local Touch panel
iv.
Ethernet switches
v.
KVM console
vi.
NTP Time server Hardware
vii.
42U cabinet
viii.
Firewall
ix.
Proposed Server based SCADA HMI System architecture
x.
Operator Consoles-Desks and Accessories
xi.
Networking Tools and Accessories
TR 6
Training – Attach training content & schedule for factory, and site training.
TR 7
User Acceptance Testing- Attach FAT & SAT, testing and commissioning procedures.
TR 8
Contractor engineering team- Attach CVs of project manager and commissioning engineer
(Must be registered professional engineers or registered professional of traceable bodies)