Tender Title | Provision of Weight Bridge for S2 Loading Station |
Tender Number | 009-SC-23-EBS (2nd Announcement) |
Tender Announcement Website | ITB documents and all clarification during the tender period will be published on the following website: www.ebspetroleum.com & http://www.ebspetroleum.com:8000/sites/tender-document/Documents/Forms/AllItems.aspx |
Bid Closing Date | No later than 16:00 (Baghdad Time), on or before 25 June 2023. In the event that closing date coincides with an official holiday or curfew, the closing date shall be automatically extended to the following working day. |
Tender Contact Emails | All clarification and correspondences from Bidders via email must be sent to tanli@ebspetroleum.com; nidawei@ebspetroleum.com; cp@ebspetroleum.com. |
Bid Delivery | Bid Proposals must be delivered by following information. Attention: Ms. Tanli and Mr. Ni Dawei Address: EBS Petroleum S2 Camp, Nahrawan, Baghdad, Iraq. Tel: 07734937875/07729819797 |
Entry Pass | Bidder must provide entry pass application form (refer to attachment C in Section 1) at least 2 working days prior Bid Closing Date. |
Bid Validity Period | Bidder’s bid Proposal shall be irrevocable for a period Two Hundred Forty (240) calendar days (“Bid Validity Period”). |
Key Factors | Fail to meet any of below key factors will lead to disqualification: (1)Submission of BID ACKNOWLEDGEMENT (refer to attachment A in Section 1) (2)Bid bond submission (3)Bid proposals are in properly sealed condition (4) Commercial proposal is separate from Technical proposal. (5) Submission of Valid Certificate of incorporation/Business registration showing the business nature under applicable laws; and Tax Registration Document/Tax ID under applicable laws; (6) Submission of Authorization Letter from Manufacturer (if Bidder is not the original Manufacturer of weighbridge) (7) Clear & well responded, Manufacturer introduction, equipment and components parameter, introduction, description and illustration. The models of all equipment and components shall meet the requirements of ITB (8) Submission of QHSE management system and performance |
Bid Bond | Bid bond: USD 15,000.00(US. Dollar Fifteen Thousand only), The Bid Bond must be delivered to Company in a separated and sealed envelope and duly marked and stamped on outer envelope. The original validity of the bid bond shall be the same as aforementioned Bid Validity Period |
Clarification and Extension | Subject to Article 5/Section 1, Bidders shall submit their clarification request no later than 7 calendar days before Closing Date. Subject to Article 12 / Section 1, extension request from bidders shall be made no later than 3 working days before Closing date. |
Joint Bidding | Joint bidding is NOT accepted by Company. |